I agree, I always thought it would be a shame and unnecessary to pull the old stand down.monkeywrench":yulw2ae8 said:Can't wait to see the finished stand. I love the fact that we're doing a refurb - it will give us something really unique rather than these identikit stadia you see everywhere.
So it is the stand I wanted and something I'll be very proud of.
The drainage never was an issue Ian. PCC simply requested further information, all very normalIJN":385kwq23 said:The drains though, the drains!!
Never again!
khennes_904":3vnlyvrr said:Please give a thought to the many Pasoti posters whose hopes have been dashed by this brilliant news..where to next for them ?
IJN":lamnuhkv said:Now the contract has been sign it won't be Tuggers.
That's there's a collective sigh of relief over Plumer House today I'd imagine.
Argylegames":2pwvkgfc said:Dalton Is God":2pwvkgfc said:Good news it’s finally been signed.
However I did notice ‘will open early in the 2019-20 season’. So does this suggest it won’t be ready for the start of the season?
Or will the stand be in place ready for fans but other facilities still being finished off...
The finish date has been stated as October '19 for quite a while.
samjones":26ccubik said:1.Capacity is bleddy rubbish we should have 40000 seats
2. The refurb is rubbish we should be getting state of the art stadium for £6M
3.Typical Argo leaving it this long to sign up the main contract we have had the summer of no football
4. Phase 2 will never get done. Typical bleddy argo.
5. Temp buildings bleddy rubbish
Argyle Nutter":2tgaah05 said:samjones":2tgaah05 said:1.Capacity is bleddy rubbish we should have 40000 seats
2. The refurb is rubbish we should be getting state of the art stadium for £6M
3.Typical Argo leaving it this long to sign up the main contract we have had the summer of no football
4. Phase 2 will never get done. Typical bleddy argo.
5. Temp buildings bleddy rubbish
#wotnohashtags
samjones":1nvlnmsu said:Argyle Nutter":1nvlnmsu said:samjones":1nvlnmsu said:1.Capacity is bleddy rubbish we should have 40000 seats
2. The refurb is rubbish we should be getting state of the art stadium for £6M
3.Typical Argo leaving it this long to sign up the main contract we have had the summer of no football
4. Phase 2 will never get done. Typical bleddy argo.
5. Temp buildings bleddy rubbish
#wotnohashtags
#sarerelegated