IJN":18bl2hnj said:I think the roof coming off will be one of the most enthralling things to see.
Indeed, but it will need to be done when there are no gales forecast! They couldn't have done it in the last few days.
IJN":18bl2hnj said:I think the roof coming off will be one of the most enthralling things to see.
Argylegames":2lsadeza said:IJN":2lsadeza said:I think the roof coming off will be one of the most enthralling things to see.
Indeed, but it will need to be done when there are no gales forecast! They couldn't have done it in the last few days.
Kevin_Gollop":1d2cfk5h said:
Argyle-sy":29tpn02u said:Kevin_Gollop":29tpn02u said:
When I first started watching Argyle back in 85 I used to stand in the lower Mayfair, right next to the tunnel. In a way it's sad seeing the old girl(grandstand and lower Mayflower) go, but at the same time I know that if Argyle want to progress both on and off the pitch then we do need new facilities. I haven't said much about the Mayflower and Grandstand development, but I can't wait to see the finished article, it will bring Argyle into the 21st century, and benefit the club in a vastly improved way.
northroadwest1":360egzb6 said:What’s happening to the old tunnel? Is it just being filled in?
I wonder what his opinion is now. Not posted for 3 weeks.The Grumpy Loyal":gdbxh8dt said:I’m sorry mate, but if anything - anything at all, had been happening inside of any significance we’d have been seeing it with the official access afforded to Steve at GoS.
This is a multimillion pound contract. It doesn’t take a genius to realise that the dozens of workers who’d normally be working on a project of this scale......aren’t there.
It’s bizarre why the club cannot be transparent about why nothing is happening. (And just to reiterate, I refer to the actual Grandstand)
davie nine":okvl83m3 said:I wonder what his opinion is now. Not posted for 3 weeks.The Grumpy Loyal":okvl83m3 said:I’m sorry mate, but if anything - anything at all, had been happening inside of any significance we’d have been seeing it with the official access afforded to Steve at GoS.
This is a multimillion pound contract. It doesn’t take a genius to realise that the dozens of workers who’d normally be working on a project of this scale......aren’t there.
It’s bizarre why the club cannot be transparent about why nothing is happening. (And just to reiterate, I refer to the actual Grandstand)
Keep up the good work, Steve (at GoS).
Don't_Panic":sonub2pf said:Maybe he’s all happy & content knowing that he was wrong & things are actually happening?
Ottawa Green":287nwbbx said:If you were at the game yesterday did you notice any work had been done in the Chisholm building area.?
HC Green":1ryghqaf said:Some excavation works taking place behind the Grandstand, in area of the main entrance.