Argylegames":tfsl6c2e said:Looking at the concrete slope and the pitch, there is a lot of material to be removed to get the changing rooms at pitch level.
Frank_Butcher":1bpb15np said:Yup - working on the roof now.
Sean":1kx98x5t said:https://mobile.twitter.com/arrofitness/status/1027112557063155713/photo/1
A picture from the other side.